I say it every summer but mean it more this summer. Where has summer gone? Here we are mid August and I've done zero sewing. Zero. And my summer sewing list wasn't even a hard one.
starts
finishes
Here we are almost the end of the second month of 2024 and I haven't even shown you my last few finishes of 2023.
I had the fabrics cut for this table runner and just ran out of time to finish it before Christmas.
Instead of putting it away for next year, I decided to just finish it up. Of course it literally took me less than an hour to make up. That's the way it usually goes right?
busy as a bee
I have had a burst of creativity, or is it sewing time, and have been extra productive so I have lots to show you.
First up, a Diamond Ripples quilt.
I can not get enough of this!!
sew good
I've been working hard on getting caught up, or actually, stay caught up on my yearly sewing list. Do you do a list every year? I usually do one for January to July, the summer, then Christmas projects from September until the end. I try to make the summer projects all strictly quilts for me.
With that said, here's a few recent projects I've been working on.
I made up this cutie using the Wilshire Weld(currently on sale in the shop, check it out here). The pattern is Bird's Hill by The Blanket Statement. We happen to have the paper patterns available as well here.
all the things
I had a super productive weekend.
I actually made some cards. First time since probably summer this happened. It was so nice to get back to it again.
busy bee
I've been keeping myself busy with some new projects.
You knew baby quilts would be top of the list lol.
I used Riley Blakes Little Things line. It is adorable.
quilts, quilts and more quilts
I've been busy, busy quilting.
Now to find to quilt them up!
First up, this quilt for my nephew.
I used a FQ bundle of Grunge dots and the Plus Minus quilt by Quilty Love.
long weekends
We were supposed to be away for the long weekend but plans changed and I'm not unhappy about it.
We spent some time outside and more importantly, I got to spend a whole bunch of time with my sewing machine.
I finished up some projects.
this and thats
I'm trying to sneak in some sewing while still soaking up every moment of our summer.
Most days the outside wins more than my sewing machine does :)
I did up this adorable baby quilt as a shop sample.
I adore this Riley Blake alpaca fabric.
deadlines
Well, it's July 5th.
I had a deadline for finishing 4 specific quilts by July 1st.
Here's how I did.
Quilt number 1 was a grad quilt.
diversion
slowly but surely
I'm making my way through my list of quilts to finish.
1 month almost done and I completed one quilt top.
progress
I made a list May 1st of what quilts I needed to complete by July 1st.
The list isn't very long, only 4 quilts ranging from a baby to a double size.
But this is as far as I have gotten on quilt 1.